Installer & Design Assist

Durango Station Hotel & Casino

Completed in 2023, Arcon provided installer and design-assist services for an extensive range of terrazzo finishes throughout this newly built resort in southwest Las Vegas. The project features refined terrazzo and palladiana designs across the casino floor, Bel-Aire Lounge, and food court areas, showcasing custom metal inlays, mother-of-pearl aggregates, and seamless transitions between interior and exterior spaces.

Areas Worked On

Casino Circulation | Bel-Aire Lounge | Food Court

Location

Las Vegas, NV

Date of Completion

2023

Role

Installer & Design Assist

Finishes Used

Terrazzo | Palladiana Terrazzo